Truck Transport from Mumbai to Cuttack
The road distance from Mumbai to Cuttack is about 1780 km. Below are vehicle options, estimated freight charges and transit times, with instant booking.
Route facts
- Road distance
- ~1780 km
- Est. transit
- 42–58 hrs
- Pickup
- Mumbai, Maharashtra
- Drop
- Cuttack, Odisha
Vehicle options & estimated freight
Estimated freight for the ~1780 km Mumbai–Cuttack corridor, by vehicle. Tap a vehicle to book it on this route.
| Vehicle | Capacity | Est. freight* | Rate |
|---|---|---|---|
| Tata Ace | Up to 750 kg | ₹18,600 – ₹21,400 | ₹11–13 / km |
| Bolero Pickup | Up to 1.5 tonnes | ₹26,100 – ₹29,000 | ₹16–18 / km |
| 14 Ft Truck | Up to 4 tonnes | ₹33,800 – ₹38,100 | ₹21–24 / km |
| 17 Ft Truck | Up to 6 tonnes | ₹38,500 – ₹42,800 | ₹24–27 / km |
| 20 Ft Truck | Up to 8 tonnes | ₹43,200 – ₹47,500 | ₹27–30 / km |
| 32 Ft Container | 15–20 tonnes (SXL/MXL) | ₹51,200 – ₹56,900 | ₹32–36 / km |
| 40 Ft Trailer | 25–28 tonnes | ₹73,100 – ₹84,500 | ₹46–54 / km |
| 14 Ft Reefer | Up to 3.5 tonnes (–20°C to +25°C) | ₹57,400 – ₹65,900 | ₹36–42 / km |
*Estimated freight for ~1780 km, before 18% GST. Estimates are indicative and stable for planning; your exact quote is confirmed at booking based on live route and vehicle details.
Loading, tolls & route considerations
Pickup context — Mumbai
Commercial freight and transport hub in Maharashtra, connecting local industrial estates and regional supply corridors.
Drop context — Cuttack
Commercial freight and transport hub in Odisha, connecting local industrial estates and regional supply corridors.
Tolls
Estimated tolls of about ₹2,136 apply on this corridor for a medium truck; exact tolls are settled on the final invoice.
Loading & unloading
Labour for loading and unloading can be arranged on request. Free waiting time applies before waiting charges begin, based on the vehicle booked.
Frequently asked questions
What is the distance from Mumbai to Cuttack?
The road distance from Mumbai to Cuttack is approximately 1780 km, with a typical transit of 42–58 hrs depending on traffic and loading.
What is the freight charge from Mumbai to Cuttack?
Estimated freight depends on the vehicle. A mini truck starts around ₹18,600, while a 14 ft truck is roughly ₹33,800 – ₹38,100, before 18% GST.
Which truck should I book for Mumbai to Cuttack?
For small parcels a Tata Ace works; for 3–4 tonnes a 14 ft truck; for full loads a 20 ft truck or 32 ft container. VRC recommends the right size based on your weight and cargo.
How long does delivery take from Mumbai to Cuttack?
Transit is typically 42–58 hrs for this corridor, plus loading and unloading time. Live GPS tracking keeps you updated throughout.
Can I book a truck for tomorrow on this route?
Yes. You can schedule a truck in advance or book on demand for the Mumbai–Cuttack route, subject to availability.
Explore related
Book this route by vehicle
Related links
Other routes from Mumbai
Book a truck from Mumbai to Cuttack
Get an instant, transparent freight estimate — then book a verified, GPS-tracked truck.
